so I'm done with demolishion and ready for framing the bathroom and laundry closet. then hvac vents measured out to be slimmed down for more headroom. then basement sealer on back wall to prevent any water leakage...
Furniture out of the way... New Hot Water Heater Installed and moved... Pipes capped off for demolishion... Toilet removed... Ceiling Ripped out... dusty dusty.